Project Details:

THE BRIEF
The Qube were tasked with designing a modular building for use as a
multi-functional space.

THE SOLUTION
It was built with wrap around bi-fold doors which enabled a visual panoramic
view. This was important for the children as it really bought the outside into the
classroom creating a perfect learning facility for the children.

THE OUTCOME
The Qube was able to meet all needs of the school, we excavated the site into a
bank in a way to allow the building to sit flush with the current built environment.
The school wanted to create a ‘light and airy’ space which was easily accessible to
improve the children’s learning environment, the Qube provided a building to meet
this high specification on time and with minimum disruption.